IMA Automation package for small batches +With the expansion of the automatising package for low volume production, the acquisition of the main program numbers into the job list is executed by a scanner interface.
The specification of the production range takes place via the canner interface, but can also take place manually. The requirement is the automatization package for small series. | IMA Automation package for small batches + |
896
624
437
186
180
134
202
321
198
151
125
63
140
15
29
91
131